GE Hydro Solutions to refurbish two generators at Bitsch HPP1 min read
Lesedauer: < 1 MinuteIn spring 2022 General Electric Hydro Solutions has signed a service contract with HYDRO Exploitation SA, acting on behalf of the asset owner Electra-Massa SA, to refurbish two 120 MVA vertical synchronous generators at the Bitsch power plant station in Wallis, Switzerland. The main objectives of the generators’ refurbishment are to extend the lifetime of the plant for several decades and increase the performance as well as reliability of the power station. In addition, Electra-Massa SA aims to maintain the plant fully operational until and after the concession expires in 2048. The 340 MW hydropower plant will be equipped with two new state-of-the-art generators tailored to meet the customer’s specific operational needs. They will replace the previous equipment which reached the end of its life. Consequently, the hydropower plant Bitsch will benefit from more flexible generators that will improve the power plant’s overall efficiency.
photo credits: GE Renewable Energy
Share: